Steel Bright-Bar Unit, Odisha
Using S-230 & S-3301-stage shotblasting, continuousAim: cut consumption & downtime
What We Focused On
- · Improved maintenance protocols
- · Material & machine calibration
- · Reduced consumption
Consumption 13.6 → 11.4 · Downtime/mo 6d → 3.5d
Consumption 13.6 · Downtime 6 d
Consumption 11.4 · Downtime 3.5 d
- +23%
- Productivity
- −19%
- Cost
- +375 TPM
- Extra Gain