MPME Abrasives

The proof

Railway Wagon Unit, Kolkata

The largest wagon builder in East India lifted output per tonne of abrasive by nearly a third — through grade, calibration and O&M discipline.

Railway Wagon Unit, Kolkata

Largest in East India · using G-181-stage shotblasting, batch-wiseAim: increase productivity

What We Focused On

  • · Testing procedures refined
  • · Better grade of abrasive supplied
  • · Machine calibration refined
  • · O&M SOPs upgraded

Productivity — wagons / tonne of abrasive

120 wagons/tonne 159 wagons/tonne
+32.5%
Productivity
−37.5%
Cost
+48 wagons/mo
Extra Gain

Want a comparable report for your unit? The technical assessment is free.

Book yours →